FANPOD|Projects|Nestlé–MWR
Projects Executed

Nestlé Qazvin | Milk Water Recovery (MWR) System – Installation & Piping

Engineering‑driven installation and piping scope for the Milk Water Recovery system inside Nestlé Iran – Qazvin plant. This dossier‑style page summarizes the project snapshot, background and challenges, detailed scope, tie‑ins, QA/QC, handover package and delivered value.

Milk Water Recovery-Nestle Iran  
MWR Scope Milk Water Recovery installation & hygienic piping integration
4 Interfaces MWR room, Skid 8, IC Papenmeier, IF Evaporator & Later Effects
+4.40 m Level Milk & skim reception elevation as main routing corridor
Safe Cut‑over Shutdown coordination & hygienic site execution practices
Snapshot

Project Snapshot

High‑level KPIs and scope summary. Detailed figures (line sizes, quantities, test pressures) can be completed once the final PO / BOQ extraction is frozen.

Client & Location

Client: Nestlé Iran Private J.S. Company
Site: IR PL Qazvin (Factory), Qazvin–Karaj Road
Area: Milk & skim reception level at approximately +4.40 m.

FANPOD Engineering executed the on‑site installation and stainless‑steel piping works associated with the Milk Water Recovery (MWR) system, connecting the MWR room to existing process units.

Scope at a Glance

  • Installation of MWR equipment inside the dedicated MWR room.
  • Stainless‑steel piping between MWR and Skid 8, IC Papenmeier, Later Effects and IF evaporator.
  • Main drain routing and stainless‑steel pipe holders for the complete MWR piping network.
  • Preparation of an installation ready for Nestlé commissioning and water‑recovery operation.
Background & Challenge

Integrating MWR into a Live Dairy Factory

The Qazvin factory is a live, high‑throughput dairy site. Any new water‑recovery system must be integrated with minimal disruption, within existing building constraints and strict hygienic and safety frameworks.

Brownfield Integration

The MWR system had to be installed around existing equipment such as Skid 8, IC Papenmeier, Later Effects and the IF evaporator, as well as within the dedicated MWR room.

  • Work inside an operating plant with controlled access and short shutdown windows.
  • Routing through predefined corridors without blocking other process or utility lines.
  • Maintaining accessibility for operation, maintenance and cleaning activities.

Multiple Process Interfaces

FANPOD’s role was to translate the MWR design package into a buildable, safe and maintainable installation on site, coordinating with Nestlé and OEM suppliers.

  • Elevation and tie‑in philosophy for all MWR lines and manifolds.
  • Sequencing of works to avoid interference with production and CIP cycles.
  • Compliance with Nestlé’s technical specifications and local regulations.
QA/QC & Testing

Verifying Routing, Integrity and Readiness

The installed MWR lines, drains and supports were checked to confirm alignment with Nestlé site requirements and to prepare the system for commissioning and later performance tests.

As‑Built Verification

  • Verification of MWR line routing versus issued drawings and physical constraints.
  • Check of elevations and tie‑in locations, including the +4.40 m reception level.
  • [Insert any site punch‑list closure or as‑built mark‑ups once available.]

Pressure & Leak Testing

  • Pressure tests for selected lines as defined by project specifications.
  • Visual leak checks of welds and field joints.
  • [Add test pressures, media and durations from test reports when compiled.]

Hygiene & Drainability

  • Control of slopes for drain and recovery lines where applicable.
  • Verification of access for manual or CIP cleaning where foreseen.
  • Coordination with Nestlé QA/QC where required for hygienic design acceptance.

Documentation & HSE

  • Installation records and checklists aligned with site procedures.
  • Execution under Nestlé safety protocols and permit‑to‑work system.
  • [List of documentation: method statements, inspection sheets, test reports, etc.]

Need support for process & utility installations?

FANPOD Engineering supports food & beverage plants in Iran with detailed installation and piping works – from concept layouts and BOQ development to on‑site execution and commissioning support.

Contact FANPOD Engineering